
As an alternative to snow removal, Gelderman installed inground heat cables for a property in Burlington.
Gelderman managed a project in Burlington installing Electrical Heat Cables under a walkway and driveway. The walkway is on the east side of the house and rearely sees sun the winter.
A moisture gauge turns on automatically in snowy and icy conditions.
The cables
Project GLS managed in Burlington, where we had Electrical Heat Cables installed under a walk and a driveway that is on the east side of a house and rarely see sun in the winter. It comes with a moisture gage that turns it on automatically in the snow and Ice.
We have also installed them at the entrance gate so that snow does not pile around the gate.